We have some new curtains in the lab. We also now have the big power supply in its rack (it weights 120 Kg). All we need is 380V !
JF and I are make progress on the coils. We ran out of glue so we will have to wait for the Farnell delivery. It is a exausting job.
JF and I coiled the first layer of the coils today. We had to adjust the size of the former on the lathe and therefor had to drill an off axis hole.
We have finaly begun the coiling of our big feschbach resonnance coils. It is going to take us a while, as they are huge.
We have changed the rigging of the vacuum system to a more sturdy one. We have also used chains rather than straps near the vacuum chamber, to be able to bake.
This week has been an exiting week : we have finally built the vacuum system that we have been designing for the last 4 month.